The Insulation Survey
Both the loft and cavity will require an Insulation Survey prior to the installation of any Cavity Wall Insulation or Loft Insulation. This will determine the suitability of the property for insulation measures. This free Insulation Survey typically takes around 20 to 30 minutes and you are not obliged to go ahead afterwards.
Loft Insulation Survey
The following points are checked during a survey for loft insulation:
- Depth of insulation required.
- Area of insulation required.
- Length of pipe work to be lagged.
- Number of cold water tanks to be insulated.
- Position of the hatch relative to tanks and pipes.
- Ventilation is adequate.
- No damp is present.
Don't Wait To Insulate..
- The UK has just experienced the coldest Winter for 40 years.
- Tens of thousands of people applied for Home Insulation Grants.
- Many applicants experienced long waiting times of up to 3 months.
- In the Spring and Summer, waiting time can be as little as 1-2 weeks.
(1st September 2010)
Cavity Wall Insulation Survey
The following points are checked during a survey for cavity wall insulation:
- Width of the cavity.
- Area of insulation required.
- Type of structure.
- Services through the cavity.
- The cavity is free of debris.
- The damp course is not defective.
- The cavity tops are sealed.
- Condition of the structure.
- Ventilation is adequate.
- No damp is present.
Please visit our home page for an overview of the grants
and the advantages of installing Home Insulation.







Contact Information: